    Roosendaal, Burg. Freijterslaan-Kade, turbo roundabout. On three legs of this November 2007 roundabout cyclists may cross in both directions. Here they have priority over motor vehicles. Special features are extra traffic islands between the lanes and cautionary lights. Currently opinions are favourable. Both circulation and interaction between cyclists and motorists have improved.

  • 2. Location and traffic volume

    Burg. Freijterslaan is a major route from the A17 motorway to the town centre (approx. 2,000 motor vehicles/peak times). The sidestreets are less busy. Intersection volume is over 2,500 motor vehicles at peak times. The main cycling route runs west-east along Burg. Freijterslaan towards Kade and vice versa.
    In the old situation the intersection Burg. Freijterslaan/Kade was regulated by traffic lights. Calculations predict a traffic volume of over 3,000 motor vehicles at peak times for this intersection by 2015. Due to this increase the capacity of the traffic lights will soon be insufficient for good traffic management. Local authorities therefore searched for a different solution.

  • 3. Design

    The basis for the design was a standard turbo roundabout with two lanes in the main direction. The other legs have single lanes. A small bypass was added for motor vehicles turning right from east to north.
    A two-way bike path has been constructed on three of the four legs. Cyclists have priority over motor vehicles there. The east leg lacks a bicycle crossing, to prevent future problems with handling capacity for motor vehicles. Moreover, the two-way crossing at the western leg provides a better connection to the main cycling route. Special features are the extra traffic islands between the lanes and the cautionary lights.

  • 4. Extra traffic islands

    Both entrances and exits have been provided with extra traffic islands between the lanes. These islands offer cyclists an opportunity for better anticipating motor vehicles on the second lane. In addition cyclists are able to cross the road in stages. Motorists on the second lane also have more opportunity to anticipate crossing cyclists and pedestrians. The danger of blocked-view accidents is however not completely eliminated. According to local authorities the design ensures more interaction between cyclists and motorists. Each looks for eye contact to ascertain his presence has been noticed.

  • 5. Cautionary lights

    To make motorists more aware of crossing cyclists, cautionary lights have been installed over the lanes, which start to blink at the approach of a cyclist. Initially the cautionary lights were operated by infrared light. This proved to be not reliable enough. The equipment worked too late and at the wrong times. Therefore detection loops have been installed. Announcements occurs smoothly now and chances of not being detected have decreased. From the moment of detection the lights will blink for 7 seconds. However, due to the lack of cancellation lights the follow-up is not perfect yet. If the cyclist passes the detection loop after his crossing, he triggers a new action and the lights will start to blink again. This problem still has to be solved. The costs of the detection system were € 25,000.

  • 6. Bicycle crossing: other details

    The bicycle crossing on the busiest leg has been combined with a pedestrian crossing. Both are raised. The distance between the crossing and the roundabout is approximately 5 metres. The design of the raised platform differs slightly from the recommendations of CROW-publication 257 Turborotondes (which was published later). On this roundabout the platform starts immediately in front of the crossing, whereas CROW recommends having the platform start approximately 5 metres in front of the crossing (if possible). This will reduce speed at an earlier stage and allows motorists to better anticipate crossing pedestrians and cyclists. Moreover this allows a motorist to wait on the platform.

Design example
2008
Hilversum, Joost den Draaijerrotonde. In de zomer van 2007 is in Hilversum de eerste halve turborotonde van Nederland geopend met voorrang voor fietsers. (Althans, voor zover bekend is dit de eerste). In de loop van 2008 worden de resultaten van de evaluatie verwacht. Volgens de gemeente zijn de eerste ervaringen positief. Met video-impressie.
Design example
2008
Hilversum, Joost den Draaijer roundabout. In the summer of 2007 the first semi-turbo roundabout in the Netherlands (at least as far as we know) with right of way for cyclists was opened in Hilversum. In 2008 results of the evaluation are to be published. According to local authorities the first results are positive.  
Notice
2008
Standpunt van het Fietsberaad over CROW-aanbeveling 257 over Turborotondes. Zie tabblad 'gerelateerde items' voor reactie CROW.
Erwin Augustijn
28-08-2009 @ 15:40

Deze rotonde heeft niet alleen maar voordelen.

Als fietser moet je regelmatig oppassen voor auto's die óf maar één kant in de gaten houden of die denken de fietser nog nét even voor te zijn. Uit ervaring kan ik spreken dat het veiliger geweest was wanneer de fietsoversteek maar één richting kende (dus aan de andere kant van de rotonde eenzelfde oversteek!) én de oversteken iets verder van de rotonde vandaan zouden liggen.

Verder is het wel een mooie rotonde die zeker de doorstroming wel heeft verbeterd.